Local Law 97, Simplified for UES Co‑ops and Condos

November 6, 2025

Wondering how Local Law 97 will affect your Upper East Side co-op or condo? You are not alone. Boards, managing agents, and buyers across the UES are asking what counts, when deadlines hit, and how upgrades will impact budgets and resale. In this guide, you will get a clear, plain-English overview of what LL97 covers, what timelines look like, the most common retrofit pathways for UES buildings, and how to plan your next steps with confidence. Let’s dive in.

What LL97 covers on the UES

Local Law 97 applies to most larger multifamily buildings in New York City. On the UES, that includes many pre-war co-ops, post-war towers, and larger condos.

  • Size threshold: LL97 applies if your building is larger than 25,000 gross square feet. If you cross that threshold, the law applies at the building level.
  • Building-level standard: Compliance is measured for the whole building, not individual apartments. For condos, the condominium association is responsible. For co-ops, the cooperative corporation is responsible.
  • Emissions-based limits: The law sets carbon emissions limits based on building use. Limits are expressed per square foot and get stricter over time.
  • Two compliance periods: Buildings must meet average annual limits in each window: 2024 to 2029 and 2030 to 2034.
  • Uses benchmarking data: LL97 uses your existing NYC benchmarking (Portfolio Manager) data to assess compliance. Accurate utility data and entries are essential.
  • Exemptions are narrow: Certain uses have special rules, and classification or floor area changes can affect applicability. These cases are handled through NYC guidance and administrative processes.

Deadlines, reporting, and enforcement

Your building must continue annual benchmarking and ensure utility data is complete and accurate. LL97 compliance is then calculated using that data against your building’s emission limits for each period.

  • Reporting: Keep monthly and annual energy data organized and auditable in ENERGY STAR Portfolio Manager. This is the basis for LL97 calculations.
  • Deadlines: Benchmarking deadlines still apply each year. LL97 limits are assessed over the periods noted above, and buildings must meet the average annual limit for each period.
  • Penalties: If a building exceeds its limit, it is subject to financial penalties based on the amount of excess emissions and assessed annually. NYC provides notices and an administrative process to review or contest findings.
  • Compliance tools: Buildings can combine efficiency upgrades, fuel switching, and eligible renewable energy strategies. Off-site renewables and credit-like instruments are limited and require strict documentation per NYC rules.
  • Plan early: Many buildings will not meet 2030 limits without significant work. Smart boards start with an audit, set a phased plan, arrange financing, and then execute in steps.

UES building realities that shape your plan

The Upper East Side has a unique mix of older masonry buildings and mid- to high-rise structures. That affects what works best and how fast you can move.

  • Central plants: Many buildings use steam or hydronic heating with natural gas systems and shared domestic hot water.
  • Landmark constraints: Historic or landmarked facades often limit exterior window changes. Interior or secondary strategies are common.
  • Space limits: Tall buildings have limited roof area for solar. On-site renewables can help, but they rarely cover a significant share of total load.
  • Resident impact: Upgrades that touch heating distribution or hot water can be disruptive. Phasing and clear communication are key.

Practical retrofit pathways

Your best plan likely combines operational changes with capital projects over time. Start with lower-cost measures that reduce usage quickly, then move to deeper work.

Efficiency and controls

Efficiency is the fastest way to lower emissions and bills in year one.

  • Boiler upgrades and tune-ups: Right-size and stage boiler plants, consider higher-efficiency options where compatible, and add variable-flow pumping.
  • Steam optimization: Repair or replace traps, insulate piping, and improve condensate management to cut waste.
  • Domestic hot water: Insulate tanks and piping and add smart controls to reduce standby losses.
  • Controls and BMS: Add or upgrade building management systems for scheduling, heat setbacks, and zone controls where feasible.
  • Lighting: Retrofit common and exterior areas with LEDs.

Envelope and resident-facing measures

Envelope improvements reduce the building’s heating and cooling load.

  • Windows and glazing: Interior storm windows or secondary glazing can be acceptable for landmarked facades and reduce drafts and heat loss.
  • Air sealing and insulation: Target stairwells, bulkheads, roofs, and penetrations to limit infiltration.
  • Entrances: Tighten doors and vestibules to cut lobby heat loss.

Electrification and fuel switching

Electrification delivers larger emissions reductions but needs planning.

  • Heat pumps: Consider central cold-climate air-source heat pumps for common areas or phased in-unit solutions where distribution allows. Large central plants may use modular water-source systems or electric heat pumps.
  • Hot water electrification: Heat pump water heaters can replace gas-fired domestic hot water systems at a commercial scale.
  • Grid capacity: Evaluate electrical service upgrades and coordination needs early to avoid delays.

On-site renewables and storage

  • Rooftop solar: Useful but often limited by roof area on taller UES buildings. Works best alongside efficiency and electrification.
  • Battery storage: Can help manage peaks if incentives and tariff structures justify installation.

Metering and resident engagement

  • Submetering: Better data leads to targeted actions in common areas and, where allowed, apartments.
  • Engagement: Resident education and feedback loops can drive measurable savings.

Sequencing and pilots

Many boards test measures before committing to a whole-building approach.

  • Pilot projects: Try improved boiler controls or heat pump pilots on select floors.
  • Phasing: Stage construction to spread costs, reduce disruption, and learn what works best in your building.

Budgeting and financing tools you can use

Several programs can lower upfront costs. Work with your managing agent, engineers, and counsel to align incentives with your building’s structure and tax status.

  • Utility incentives: Con Edison offers programs and rebates for heat pumps, lighting, and controls.
  • NYSERDA and federal: NYSERDA provides incentives and technical help. Federal Inflation Reduction Act benefits may apply, but co-op and condo corporations should consult tax counsel on eligibility.
  • C-PACE: Property Assessed Clean Energy financing can fund large efficiency and electrification projects for qualifying properties.
  • Green capital: NY Green Bank and other lenders offer green loan products. Some grants and special programs may be available for certain affordability designations.
  • City support: NYC Retrofit Accelerator provides free technical assistance and contractor connections.
  • Board funding: Use reserves, bank financing, refinancing, or special assessments. Update reserve studies to reflect LL97 needs.

What this means for buyers and sellers

LL97 is changing the conversation in due diligence and pricing. A clear plan can be an asset in today’s market.

  • Assessments and fees: Boards may use special assessments or adjust maintenance/common charges to fund LL97 projects.
  • Due diligence: Buyers and lenders increasingly ask for a written compliance plan, audit results, and the capital schedule.
  • Resale narrative: Buildings with a documented, funded path to compliance can market lower risk. Those without a plan may face buyer pushback or longer negotiations.
  • Insurance and O&M: New systems can change operating costs and underwriting; keep documentation current.

A simple LL97 checklist

For boards and managing agents

  • Confirm your building is larger than 25,000 gross square feet.
  • Verify accurate benchmarking data and assign a single point of contact for utility tracking.
  • Commission an energy audit that projects emissions against 2024 to 2029 and 2030 to 2034 limits.
  • Build a prioritized list of measures with costs, carbon impact, and disruption level.
  • Assess electrical service capacity and coordinate with Con Edison on upgrades if needed.
  • Review landmark or zoning constraints early, especially for envelope and window work.
  • Map financing options such as C-PACE, loans, reserves, or assessments, and check your governing documents for necessary approvals.
  • Identify incentives and consult tax counsel about federal benefits.
  • Prepare a resident communications plan and align disclosures for resale.
  • Create a compliance calendar with clear roles and dates.

For buyers

  • Confirm if the building exceeds 25,000 gross square feet and is covered by LL97.
  • Review benchmarking history and any available energy reports.
  • Request the board’s LL97 plan, capital schedule, and anticipated assessments or fee changes.
  • Ask about audits, pilot projects, and the condition of central mechanical systems.
  • Check for any outstanding LL97-related notices or violations.
  • Review minutes and engineering reports for cost estimates and financing approach.

Next steps for UES boards today

  • Verify coverage and confirm benchmarking is accurate and current.
  • Order an energy audit and emissions projection now to understand your status relative to current and upcoming limits.
  • Execute low-cost, high-impact steps like controls, steam optimization, LED retrofits, and hot water improvements.
  • Pilot electrification strategies on a limited basis before committing to whole-building changes.
  • Build a financing plan and line up incentives, then phase construction to match resident needs and cash flow.
  • Keep residents informed and fold LL97 planning into reserve studies and board agendas.

Work with a local team that understands LL97

You do not have to navigate this alone. Whether you are a board planning capital work, a seller preparing disclosures, or a buyer comparing buildings, a clear LL97 strategy can protect value and reduce surprises. If you want to discuss how compliance may affect your purchase or sale on the Upper East Side, reach out to the The Heard | Khedr Team to get a practical plan. Ready to list or just curious where you stand? Book a Home Valuation and we will walk you through next steps.

FAQs

Does LL97 require removing gas boilers now?

  • No. The law requires buildings to meet emissions limits over each compliance period. Many start with efficiency and controls before planning full electrification.

Who pays LL97 penalties in a condo or co-op?

  • Penalties apply to the building entity. Boards may fund costs through assessments or changes to common charges, which can affect unit owners indirectly.

How disruptive are LL97 retrofits for residents?

  • It depends on scope. Boiler and controls upgrades can be relatively low disruption, while full electrification or envelope work can be more invasive and should be phased.

Can we use renewable energy credits to comply?

  • Some on-site and qualifying off-site renewable options are allowed under strict NYC rules, but they are limited. Most buildings pair renewables with efficiency and electrification.

What if the building is landmarked on the UES?

  • Landmark status can limit exterior changes. Work with experienced architects and landmarks counsel. Interior storm windows and non-visible insulation are often viable.

What should buyers ask about LL97 during due diligence?

  • Ask for the building’s LL97 plan, audit reports, expected assessments, and any notices or violations. Review benchmarking data and the capital schedule.

What timeline should boards follow to prepare for 2030 limits?

  • Start now with an audit, low-cost measures, pilot projects, and financing. Many buildings need several years to design, fund, and complete deeper retrofits.